Enterprise projects delivered for clients in Pakistan β and built to last.
JDW Group is one of the biggest industrial companies in Pakistan β they produce sugar and generate electricity across multiple locations. In 2017, they needed a full datacenter built at several sites simultaneously.
Multiple sites needed enterprise datacenter infrastructure simultaneously, with zero tolerance for downtime on critical business systems.
Deployed VMware ESXi 5.5 clusters with HA across all sites. Installed Dell PowerEdge servers, configured RAID, set up SQL Server HA and all business VMs. Managed the entire project solo.
Full multi-site datacenter running. Years later, JDW Group called again for the ESXi 5.5 β 7.2 upgrade β a clear sign of complete trust in the work.
Built a full enterprise-style VMware lab from scratch to prove and sharpen real enterprise VMware skills.
Prove enterprise-level VMware skills with a real working environment β not just theory or certifications.
Two Fujitsu servers running ESXi 8.0, managed by vCenter 8.0.3. Shared NFS storage, HA, DRS, vMotion, Distributed Virtual Switches, VM templates, Content Library and role-based access.
Real failover tests passed β deliberately crashed a host and watched VMs restart automatically. Also planned and tested migration to HPE VM Essentials.
Link Azure DNS with an on-premises lab and build a working email server. Azure blocks standard port 25.
Set up DNS zone in Azure, linked to on-premises lab. Built Postfix email server on Ubuntu. Routed email through SendGrid on port 587 to bypass Azure restrictions.
Fully working email server with Azure DNS integration. All servers can reach each other by name across cloud and on-premises.
A Cisco AIR-AP3802I access point was completely dead β would not boot at all. Most engineers would have replaced it.
Accessed the U-Boot bootloader, fixed environment variables, and flashed the correct firmware using TFTP. Then set up a full four-access-point Cisco Mobility Express network, solving firmware version mismatches.
Dead access point fully recovered. Complete four-AP wireless network running on Cisco Mobility Express with all devices connected and stable.
Tell us what you need and we'll make it happen.